Home / Request a Quote
Request a Quote

Tell us what to build

Quotes returned within 24–48 hours on business days. Send a style reference, a tech pack, or two lines describing the programme — any of these is enough to price.

Diamond stone setting station at Vesta Jewelry

What to expect

24–48 hours

Quote turnaround on business days, with CAD support where a reference is supplied.

NDA standard

Your designs and buyer information stay inside your account. We can sign your NDA before you send files.

Three-tier pricing

Ask for launch / repeat / volume tiers in one quote so you can plan the season.

Or message directly

WhatsApp +86 133 6531 9606 — send a photo and we reply on the same thread.

Manufacturing enquiry

Photo, sketch, tech pack or CAD file — up to 10 MB. Covered by NDA practice.

We reply within 24 hours on business days. Your brief is covered by NDA practice from the first message.

Writing the enquiry

What makes a quote come back accurate

Send a reference, even a rough one

A style number from any catalogue, a screenshot, or a phone photo of a competitor piece. A picture settles in one message what a written description takes three rounds to pin down — and we quote your version of it, not theirs.

Give a quantity tier, not an exact number

"Sample first", "a few hundred", "several thousand" is enough to price the right production path. The wrong path is the single most common reason a quote comes back looking odd.

State a grading floor rather than an ideal

"Eye-clean, near-colourless, excellent cut, IGI certified, 0.90–1.00 ct" is a production specification. A single letter grade is a negotiating position that gets revisited at sampling and moves the price.

Name your target price band

Buyers sometimes withhold this expecting a better number. In manufacturing it works the opposite way: knowing the band lets us propose the metal weight, stone programme and setting method that reach it, instead of quoting something you were never going to buy.

Raise compliance in the first message

Hallmarking, documentation, audit standards, market-specific requirements. Retrofitting compliance after a production run is the most expensive way to discover a requirement.

Timeline

Lead times & order tiers

StageWorking daysWhat happens
3D CAD design1–7 daysFrom reference, sketch or tech pack. Renders shared for approval.
Sampling7–10 daysPhysical sample to your spec; cost typically credited against bulk.
Pre-production sample (PPS)3–5 daysThe approved reference bulk production must match.
Bulk production20–25 daysAcross A/B lines. Larger programmes scheduled at quote stage.
QC & documentation1–2 daysPhoto and video review before shipment.

Order tiers: Sample orders from a single piece. Bulk tiers are quoted per design — ask for three-tier pricing (launch / repeat / volume) in your first enquiry.